Catalog Moat Creek Web Images

1-16 | 17-32 | 33-48 | 49-64 | 65-80 | 81-96 | 97-112 | 113-128 | 129-144 | 145-160 | 161-165

p5020021-iriswildflowers p5020023-iriswildflowers p5020019-rhodoswildflowers p5030038-rhododendron
P5020021-IrisWildflowers.JPG
Iris wild flowers grow in wetter areas
2004:05:02 09:06:59
P5020023-IrisWildflowers.JPG
Iris wild flowers
2004:05:02 09:10:10
P5020019-RhodosWildflowers.JPG
Rhododendrons bloom all over the property in late April and early May
2004:05:02 09:05:19
P5030038-Rhododendron.JPG
Rhododendron flowers are large and pink
2004:05:03 11:00:07
p5020029-homesiteaerial p5020028-homesitelookingsw p5030033-mollytelephoneline p5030032-ricktelephoneline
P5020029-HomeSiteAerial.JPG
Home site looking south, showing driveway entering from the bottom, past the lower cleared area (becomes a rice paddy when wet), up the hill to the trailer (look for the green grass carpet outside the front door) and shed (dark brown with shadow in early morning sun)
2004:05:02 10:11:29
P5020028-HomeSiteLookingSW.jpeg
Home site aerial view looking southwest showing shed and trailer on home site, the lower cleared area, and the driveway; note the chipper covered by a blue tarp in the bottom of the cleared home site area
2004:05:02 10:11:18
P5030033-MollyTelephoneLine.JPG
Installation of the telephone line through the woods required rolling out three lengths of cable; here Molly is rolling one of them across the ground
2004:05:03 09:45:52
P5030032-RickTelephoneLine.JPG
Rick installing a junction box between two of the cables by nailing the box to a tree; the phone worked the first time, but we had to come back and repair a broken wire after rolling the cable to the west (right).
2004:05:03 09:27:58
p5030042-ricktelephonesplic p5030035-rickconferencecall p5030034-rickconferencecall p60305-makingbattcables
P5030042-RickTelephoneSplic.JPG
Making a field splice between two of the telephone cables
2004:05:03 11:30:43
P5030035-RickConferenceCall.JPG
Rick had to make a conference call to San Diego before the line was completely installed, so we came back to the road and used the phone from there; note the culvert under the driveway -- the phone line goes from the phone company rise through the culvert and down the road to the left and then 2,000 feet through the woods to our home site
2004:05:03 10:45:58
P5030034-RickConferenceCall.JPG
It was a long conference call . . .
2004:05:03 10:45:44
P60305-MakingBattCables.JPG
Rob Harlan and Rick making battery cables, two finished ones are at Rick's feet. Other parts are on left, a couple of batteries behind Rick.
2004:06:03 10:46:54
p60306-painting p60307-wiringsolarpanels p60308-ericbrucemounting p60309-ac-dc-atwork
P60306-Painting.JPG
Bruce wiring the solar panels behind the shed, Eric painting the mounting board
2004:06:03 10:49:11
P60307-WiringSolarPanels.JPG
Six solar panels lie face down while Bruce wires them in series to create 120 volt panel array
2004:06:03 10:51:09
P60308-EricBruceMounting.JPG
Eric and Bruce get some guidance from Rob (inside shed to left) as they mount components on the board; AC breaker box on the left, inverter in the middle, DC breaker box on the right and charge controller at top right
2004:06:03 13:07:55
P60309-AC-DC-atWork.JPG
AC/DC at work; Eric wires the AC breaker box on the left while Bruce wires the DC breaker box on the right
2004:06:03 13:08:14


1-16 | 17-32 | 33-48 | 49-64 | 65-80 | 81-96 | 97-112 | 113-128 | 129-144 | 145-160 | 161-165