P2140011-AddingMorePipe.JPG
Every 20 feet down, the drilling stops and another length of pipe, stored on the rig, is moved into position so drilling can continue down, down, ... down. Note that the rear truck tires are suspended once drilling starts.
2006:02:14 11:36:43